What should this project cost?
A planning range in about thirty seconds. No email, no gate, nobody calls you. Move the pieces below and the range moves with them.
01 What are you building
Kitchen
Full remodel, one room
Bathroom
Hall bath or primary suite
Addition
New conditioned square footage
ADU
Detached or attached unit
Whole house
Multiple rooms, full scope
02 How big
−
square feet
+
40 sq ft
120 sq ft
210 sq ft
330 sq ft
500 sq ft
03 Level of finish
Essential
Durable, well built, no showpieces
Signature
Custom cabinetry, stone, designed lighting
Bespoke
Specified to the millimeter, nothing stock
04 What else is true
Adding a bathroom
Plumbing runs, waterproofing, fixtures
Removing a bearing wall
Beam, posts, engineering, inspection
Electrical panel upgrade
Service upgrade and utility coordination
Moving plumbing or gas
Relocating drains, supply or gas lines
Foundation work
New footings, piers or slab
Tying into the roofline
Framing, flashing and weather transitions
Planning range
$130,000 – $180,000
Roughly $650 to $900 per square foot, all in.
That spread is about 38%. It is wide on purpose. Anyone who narrows it before seeing your house and defining the scope is guessing, and a guess that lands low is the most expensive thing in this business.
What a range like this assumes
●
Demolition, haul-off and dump fees
●
Permits and plan check fees for one jurisdiction
●
Electrical and plumbing brought to current code
●
Materials at the finish level you selected
●
Project management, supervision and final clean
What it cannot know yet
○
What is actually behind your walls
○
Whether your panel carries the new load
○
Soil, drainage and existing foundation condition
○
The specific products you end up choosing
○
Your jurisdiction’s current plan check queue
We don’t use allowances.
We define the work.
We define the work.
A range is a planning tool. A price is a document. The difference between the two is a real takeoff, and a project this size runs past 286 line items before we sign our name to the bottom of it. That is the number you can actually build from.
Want a real number instead of a range?
A range is where planning starts. A price comes from seeing the house. Book a pre-assessment call and we will walk through what you are actually taking on.
You are looking at a 200 square foot kitchen, signature finish.
●
About twenty minutes, on the phone, at a time you pick
●
We ask about the house, the constraints, and what has to be true when it is done
●
You get a straight read on scope, sequence and what actually drives your cost
●
No charge, no obligation, and nobody shows up at your door unless you ask
Not ready to talk to anybody yet? Fair enough.
Have this range emailed to you instead and we will leave you alone.
Have this range emailed to you instead and we will leave you alone.
We use your details to send what you asked for. No list, no reselling, and one word from you stops it.
Or skip all of it and call. Real people answer. (925) 228-7376
The Mazzamuto Method · Episode 14
How much does a remodel really cost?
Estimates vs. guesstimates
Estimates vs. guesstimates
The whole conversation behind the number you just saw. Why three bids come back thousands apart, what an allowance really is, and how to tell a real estimate from a guess.
Mazzamuto Construction Inc.
Italian-born. Family-built.
837 Arnold Drive, Suites 210 & 220, Martinez, CA 94553
(925) 228-7376 · mazzconst.com · CSLB #1116913
(925) 228-7376 · mazzconst.com · CSLB #1116913
Alamo · Lafayette · Orinda
Danville · Walnut Creek · Martinez
Kitchens · Baths · Additions · ADUs
Danville · Walnut Creek · Martinez
Kitchens · Baths · Additions · ADUs